The equipment room is very narrow but long, so we have stacked some pump stands on top of each other to conserve space. The Revolution Soft Touch Machines showed up and are currently being installed.
Monday, March 22, 2010
A lot has changed!
It has been awhile since updating the blog and I apologize for that, but a lot has changed with the Terrace Heights site, and I will do my best to catch you up and update you as things change!
Bay paneling is all done,
The bay lightning done and the Halo booms have been installed.
Bay paneling is all done,
The bay lightning done and the Halo booms have been installed.