Friday, November 27, 2009

On the tracks and ready to roll!

All of the equipment has arrived! The Fusion-X is now on the tracks, vacuum islands are poured and canopies have been mounted, roofing and stucco will be complete next week.


Roofing is almost complete
Prepped for stucco
Front of machine
Back of machine
Extrutech paneling for the ceiling

Vending island

Vacuum islands
Poured vacuum island
Poured vending island
Automatic entrance
Self-serve booms
Self-serve pumping station
Trash covers


Self-serve ceiling
Backside

Wednesday, November 25, 2009

Toppenish Update..

Some of the equipment has showed up with the rest to be here in a couple days. The roofing has started and is almost complete, the vacuum island will soon be poured and the stucco has started.





Vacuum bases
Getting power
The Changer is in place
Vending island
Before filled with concrete

Terrace Heights Update

So the asphalt is done, and the floors have been poured in the bays, the stairs are now in and the vac it up is starting to be installed.

Backside asphalt (west side)
Front side asphalt (east side)


Auto entrance
Equipment room to the upstairs
Auto bay getting ready for the trough brackets
Backside changer openings
Vac island
Self-serve meter boxes
Vac it up

Wednesday, November 11, 2009

The asphalt is done!


The asphalt was started and finished today, I was amazed at how fast it went!
Rolling the front side
Vacuum islands
Front side
Laying asphalt



Waiting for the next truck

Front side completed