So the asphalt is done, and the floors have been poured in the bays, the stairs are now in and the vac it up is starting to be installed.

Backside asphalt (
west side)

Front side asphalt (
east side)



Auto entrance

Equipment room to the upstairs

Auto bay getting ready for the trough brackets

Backside changer openings

Vac island

Self-serve meter boxes

Vac it up