Thursday, October 29, 2009

Trusses

The trusses have arrived


Self-serve bays

Automatic bays


Conduit and curbs

Base for light pole
Conduit for vacuums and lighting



Curbing

Saturday, October 17, 2009

The Block Work is Complete!

The block work is complete, and the framing of the roof will start next week.
The final block

Self-Serve walls
Beam Bracket
The front peak
Automatic bays
Automatic windows

Automatic Entrance
Automatic Exit
Back side
Inside the equipment room
One of the last columns

The finished peak
Front Side

Equipment Room and Upstairs Office Space

Equipment room
Electrical for equipment

Service Panel

Bathroom/Safe room

Upstairs

Office space

HVAC Deck

South Side Wing

South wing storage

North Wing

West facing upstairs windows


Can Lighting

Roofing and Plaster

The roofing is now complete, the plaster is almost done, and the electrical has been started.
Cement board
Front (East side)



Back (West side)

Northside self-serve bays

HVAC Deck

Automatic bay trough

Floor Joists

Bases for Auto Cashiers

Southwest corner Vacuum Island

Backside

Oil water separator

Changer and Swipe-n-Clean cutouts (Backside)

Northeast corner Vacuum Island

Front side changer location between south side self-serve bays

Self-serve pit