The block work is complete, and the framing of the roof will start next week.

The final block

Self-Serve walls

Beam Bracket

The front peak

Automatic bays

Automatic windows


Automatic Entrance

Automatic Exit

Back side

Inside the equipment room

One of the last columns


The finished peak

Front Side
No comments:
Post a Comment