The roofing is now complete, the plaster is almost done, and the electrical has been started.

Cement board

Front (East side)



Back (West side)


Northside self-serve bays

HVAC Deck

Automatic bay trough

Floor Joists

Bases for Auto Cashiers

Southwest corner Vacuum Island

Backside


Oil water separator

Changer and Swipe-n-Clean cutouts (Backside)

Northeast corner Vacuum Island

Front side changer location between south side self-serve bays

Self-serve pit

No comments:
Post a Comment