The roofing is now complete, the plaster is almost done, and the electrical has been started.
Cement board
Front (East side)



Back (West side)

Northside self-serve bays

HVAC Deck

Automatic bay trough

Floor Joists

Bases for Auto Cashiers

Southwest corner Vacuum Island

Backside

Oil water separator

Changer and Swipe-n-Clean cutouts (Backside)

Northeast corner Vacuum Island

Front side changer location between south side self-serve bays